Hello,
I wrote a paper with bibliography entires (from database). Now, I have to add a paragraph within the paper and I have to add a bibliographic entry. Is there a way to auto sort and name the bibliography symbols ([1]) by document position?
For example
Paragraph 1
text text text [1]
Paragraph2
text text [2]
Added paragraph
text text [x]
Paragraph 3
text text [3]
How can I auto name the [x] symbol to [3] and the [3] to [4]?